GPC required long travel anti-collision barriers to mitigate identified risks associated with collision on the main wharf rails. Whilst already having existing systems in place, including hydraulic buffers and LiDAR systems, the anti-collision barriers provide a physical, safety rated barrier that further protect equipment and personnel. Crucial to the success of the project, Linear had to understand the needs of various stakeholders to ensure seamless integration of a new system within existing infrastructure.
Linear Engineering completed the following tasks as a part of the project:
Linear faced many design challenges throughout the project that were generally related to the Brownfield nature of the project. It was imperative the engineers and designers understood the existing functionality of the machine, as well as, other surrounding day-to-day operations on the wharf. Development of “protection envelopes” for the barriers were critical to the project and required significant stakeholder liaison. Other factors that impacted the design included:
Linear were distinctively positioned to face these challenges and provide ideal solutions, which included: