The project involved the construction of a cement terminal consisting of a 500 tph mobile cement unloader machine, 40000T of cement storage in silos, and truckloading facilities with 4 weighbridges on the existing Graincorp wharf.
The terminal’s structure and equipment were largely supplied by an overseas vendor, meaning the whole design had to be meticulously double-checked for compliance with Australian Standards. Linear also assisted SCC in the review and selection of a silo vendor capable of supplying to stringent Euro Code design requirements.
Linear supported SCC at every stage of the project, well after performing the initial design review. During fabrication, Linear personnel were involved in site visits to the Chinese facilities to check quality assurance documentation, discuss design-related issues, and to review progress. Once structure and equipment started to arrive at the Port of Brisbane site, Linear also assisted SCC with onsite construction assistance and more.